This was addressed in the webinar today, and is in the table below. The costs of the “yellow gear” as they called it is 57m
In the 424m is a +10% contingency, add to that inflationary pressures around steel, transport etc and it explains a fair whack of why the $200-$250m capex changed - edit these are my assumptions, Chris didn’t say this in the webinar, but it should be a valid assumption. Plus they added more capex to facilitate the additional capacity when they get more RPM and Korbel drilling and resource estimates done.
![]()
I would’ve liked to have seen a detailed breakdown in the announcement as to why the 200-250m was now much higher.
- Forums
- ASX - By Stock
- Ann: Korbel Gold Project Starter Pit Scoping Study
This was addressed in the webinar today, and is in the table...
-
- There are more pages in this discussion • 98 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
|
|||||
Last
21.5¢ |
Change
-0.005(2.27%) |
Mkt cap ! $45.16M |
Open | High | Low | Value | Volume |
22.0¢ | 22.0¢ | 20.0¢ | $6.119K | 28.77K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 7489 | 21.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.0¢ | 15040 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 7489 | 0.215 |
3 | 2970 | 0.210 |
1 | 25000 | 0.205 |
1 | 15607 | 0.200 |
1 | 10000 | 0.190 |
Price($) | Vol. | No. |
---|---|---|
0.220 | 15040 | 3 |
0.225 | 30564 | 1 |
0.230 | 2238 | 1 |
0.235 | 6547 | 1 |
0.240 | 23300 | 2 |
Last trade - 15.42pm 23/07/2024 (20 minute delay) ? |
Featured News
NVA (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO & MD
Charles Armstrong
CEO & MD
Previous Video
Next Video
SPONSORED BY The Market Online