I am saying something is wrong in the report and requires clarication.
You cant claim a resource estimate grade has dropped by 7% if the grading has dropped from 0.43g/t to 0.354g/t which it would need to have done to only have a resource of 3.3m/oz from 290mt.
So I am saying one of the following is wrong:
- 290mt
- 7% decrease and 0.4g/t claim
- 3.3m/oz
They need to clarify which.
- Forums
- ASX - By Stock
- NVA
- Ann: Korbel Interim Gold Mineral Resource increases to 3.3Moz
Ann: Korbel Interim Gold Mineral Resource increases to 3.3Moz, page-361
-
-
- There are more pages in this discussion • 36 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.5¢ |
Change
0.010(6.90%) |
Mkt cap ! $42.15M |
Open | High | Low | Value | Volume |
15.0¢ | 16.0¢ | 14.5¢ | $107.5K | 703.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 97305 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 161967 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 87305 | 0.155 |
6 | 319938 | 0.150 |
6 | 142874 | 0.145 |
6 | 180027 | 0.140 |
4 | 330248 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.160 | 150000 | 1 |
0.170 | 18380 | 2 |
0.175 | 33857 | 4 |
0.180 | 117642 | 1 |
0.190 | 33340 | 2 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
NVA (ASX) Chart |