There is serious uncertainly when it comes to inferred resource. It is well within the realm of possibilities that even just a couple new holes in Bock A/B could bump up the average grades from 0.354 up to 0.487 or even down to 0.283, or any number in between, with nearly equal probabilities.
The only thing that is certain is that an average grade of 0.354 in not correct. I suppose the JORC code allows rounding because 0.4 g/t is nearly just as probable as 0.354 g/t in an inferred resource.
Doesn't make it the 'right' thig to do in this particular case... but meh. It is legal, it is standard practice, and frankly, its not very significant in the grand scheme.
I'm glad you pointed this out. I'm glad we worked through this, but I'm also now 100% confident we can move on. This is really not much of a concern at all.
- Forums
- ASX - By Stock
- NVA
- Ann: Korbel Interim Gold Mineral Resource increases to 3.3Moz
Ann: Korbel Interim Gold Mineral Resource increases to 3.3Moz, page-376
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.0¢ |
Change
0.005(3.23%) |
Mkt cap ! $38.96M |
Open | High | Low | Value | Volume |
15.5¢ | 16.0¢ | 15.5¢ | $40.76K | 260.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 50778 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 20036 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 50778 | 0.155 |
4 | 141834 | 0.150 |
4 | 175742 | 0.145 |
3 | 420000 | 0.140 |
2 | 27000 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 20036 | 1 |
0.175 | 10000 | 1 |
0.180 | 37701 | 4 |
0.185 | 5555 | 2 |
0.195 | 104995 | 2 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
NVA (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online