You're right about running above nameplate capacity but I doubt it will be capable of 6 Mtpa. That rate requires expansion of other parts of the process. The 6Mtpa crusher has been purchased with the future in mind.
'design allowance made for future upgrades to the capacity of the grinding, leaching and elution components with minimal production interruption and low capital expense'
DCN plant has been running ~15-20% above nameplate fairly consistently. That was designed and built by GR Engineering who I would have thought will be in the box seat to build RED's also.
Reasonably large increase in AISC since the PFS but might be a fact of just bringing more deep material into the mine plan and extending the mine life. Gold price increase obviously helps offset that.
- Forums
- ASX - By Stock
- RED
- Ann: KOTH Final Feasibility Study delivers 2.4Moz reserve
Ann: KOTH Final Feasibility Study delivers 2.4Moz reserve, page-8
-
- There are more pages in this discussion • 40 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RED (ASX) to my watchlist
(20min delay)
|
|||||
Last
35.0¢ |
Change
0.005(1.45%) |
Mkt cap ! $2.380B |
Open | High | Low | Value | Volume |
35.5¢ | 36.0¢ | 34.8¢ | $7.381M | 20.99M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 500592 | 35.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
35.5¢ | 479161 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 500592 | 0.350 |
19 | 996212 | 0.345 |
34 | 2718150 | 0.340 |
36 | 1567563 | 0.335 |
40 | 2815482 | 0.330 |
Price($) | Vol. | No. |
---|---|---|
0.355 | 479161 | 12 |
0.360 | 1177696 | 20 |
0.365 | 1278164 | 17 |
0.370 | 990457 | 11 |
0.375 | 829372 | 13 |
Last trade - 16.10pm 16/08/2024 (20 minute delay) ? |
Featured News
RED (ASX) Chart |