LPD 0.00% 0.3¢ lepidico ltd

Hi @Logzy. It says “construction ready”meaning ready to...

  1. 1,028 Posts.
    lightbulb Created with Sketch. 541
    Hi @Logzy. It says “construction ready”meaning ready to construct, this includes permits, Board ID based on feasibility study of economics from both demo plants, Front end engineering design etc. It is not “construction finished”. Our plant costing $250mil is smaller than their’s and they are building two plants so those that think this is total funding are deluded. Both plants will cost a further $0.5 bil minimum.
    The date of the "Lithium - Spring - Newsletter 2023 is more than likely Mar - Apr this year.
    Nothing has changed re demo plants timelines.
    Last edited by RTFQ: 15/08/23
 
watchlist Created with Sketch. Add LPD (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $22.91M
Open High Low Value Volume
0.3¢ 0.3¢ 0.3¢ $36.00K 12.04M

Buyers (Bids)

No. Vol. Price($)
144 211587442 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 16521538 18
View Market Depth
Last trade - 15.59pm 29/04/2024 (20 minute delay) ?
Last
0.3¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
0.3¢ 0.3¢ 0.3¢ 6199999
Last updated 15.56pm 29/04/2024 ?
LPD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.