For Techmet to have secured DFC funding intended for CCL would have required pilot/demo plant run data more than likely supplied by our independent engineering report. This pretty much ensures our US DFC funding once the ownership details for the plant are sorted in Abu Dhabi.
- Forums
- ASX - By Stock
- Ann: L-Max/LOH-Max Licensee Secures Demonstration Plant Finance
For Techmet to have secured DFC funding intended for CCL would...
- There are more pages in this discussion • 43 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LPD (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.001(33.3%) |
Mkt cap ! $34.35M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $28.74K | 7.766M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
55 | 61590653 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 61142821 | 65 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
51 | 59085140 | 0.003 |
167 | 223014523 | 0.002 |
42 | 161570039 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 52443632 | 60 |
0.005 | 16213086 | 23 |
0.006 | 5720261 | 12 |
0.007 | 5373897 | 7 |
0.008 | 2687232 | 5 |
Last trade - 16.10pm 31/05/2024 (20 minute delay) ? |
|
|||||
Last
0.4¢ |
  |
Change
0.001 ( 16.7 %) |
|||
Open | High | Low | Volume | ||
0.3¢ | 0.4¢ | 0.3¢ | 5779342 | ||
Last updated 15.59pm 31/05/2024 ? |
Featured News
LPD (ASX) Chart |