will be a hard sell. someone has to stump up the cash for the new tanks and pipes. TEG needs to shore up more reserves so they can provide certainty the facilities would be used for longer than 4 years.
from 2006: if it needs to be same size you would have to double that number with todays steel prices.
https://www.jtsi.wa.gov.au/docs/default-source/default-document-library/june-august-2006?sfvrsn=9
icon engineering did some concept designs for geraldton back in 2003.
https://www.iconeng.com.au/track-record/projects/roc-cliff-head-project-conceptual-engineering
- Forums
- ASX - By Stock
- Ann: L7 Permit Prospective Resources Increase
will be a hard sell. someone has to stump up the cash for the...
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TEG (ASX) to my watchlist
|
|||||
Last
2.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $36.26M |
Open | High | Low | Value | Volume |
2.0¢ | 2.0¢ | 2.0¢ | $8.144K | 410.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 4230315 | 1.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.0¢ | 2113287 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 4230315 | 0.019 |
15 | 3661317 | 0.018 |
8 | 2415937 | 0.017 |
7 | 2932379 | 0.016 |
7 | 1335666 | 0.015 |
Price($) | Vol. | No. |
---|---|---|
0.020 | 2113287 | 6 |
0.021 | 4518015 | 11 |
0.022 | 2200129 | 9 |
0.023 | 1868081 | 8 |
0.024 | 2258249 | 8 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
TEG (ASX) Chart |