MLS 2.50% 2.0¢ metals australia ltd

Assume this week the bridge be installed. (Within next 5 days)....

  1. 8,035 Posts.
    lightbulb Created with Sketch. 1821
    Assume this week the bridge be installed. (Within next 5 days).
    -The rest of August + Sept : Stripping and channel sampling .
    -Late Sept + Oct Drilling .
    -Some Drilling cores sample testing in Nov.
    -4-6 weeks results waiting ,Dec.

    Chirstmast time , Hopefully ...

    IMO.
    Cheers.
    Last edited by Petertkd: 13/08/18
 
watchlist Created with Sketch. Add MLS (ASX) to my watchlist
(20min delay)
Last
2.0¢
Change
-0.001(2.50%)
Mkt cap ! $14.18M
Open High Low Value Volume
1.9¢ 2.0¢ 1.9¢ $7.859K 394.1K

Buyers (Bids)

No. Vol. Price($)
11 1981412 1.9¢
 

Sellers (Offers)

Price($) Vol. No.
2.0¢ 444245 1
View Market Depth
Last trade - 15.31pm 26/08/2024 (20 minute delay) ?
MLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.