So the guaranteed application area is the reservoir with 3.94 million cubic metres capacity. Typical application rate for Phoslock is 150 mg/l. That equates to 591 t x $3000/t = $1.7 million. Maybe add the same amount for engineering work.
The story here is the potential to win the contract for the entire catchment, and that's a hell of a story if it comes off, but the guaranteed income is modest at this stage.
- Forums
- ASX - By Stock
- PET
- Ann: Lake Dianchi & Catchment - New Project Area
Ann: Lake Dianchi & Catchment - New Project Area, page-15
-
- There are more pages in this discussion • 85 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
Add PET (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $15.60M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PET (ASX) Chart |
Day chart unavailable