Did you read about Black Swan Plant Status? Here are abstract from Research Report (link 2023.08.17-MST-Access-POS-Update-Note-17Aug23.pdf (poseidon-nickel.com.au)
..
"The SAG mill (1.1mtpa of capacity) has a crack in it. This will require a reasonably significant repair, but will not need to be replaced" Any thing significant means a lots of money.
..
There has been a wall failure at the southern end of the pit. The failure is not significant, and as the pit requires a cut-back in order to reach the deeper open pit ore, the wall failure will be corrected by this process
..
Link below
2023.08.17-MST-Access-POS-Update-Note-17Aug23.pdf (poseidon-nickel.com.au)
- Forums
- ASX - By Stock
- POS
- Ann: Lake Johnston Drilling Underway
Ann: Lake Johnston Drilling Underway, page-20
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POS (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
-0.001(14.3%) |
Mkt cap ! $25.99M |
Open | High | Low | Value | Volume |
0.7¢ | 0.7¢ | 0.6¢ | $5.241K | 804.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
31 | 23176459 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 17021652 | 51 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
31 | 23176459 | 0.006 |
46 | 41274401 | 0.005 |
54 | 37984213 | 0.004 |
23 | 27369817 | 0.003 |
15 | 17850024 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 17021652 | 51 |
0.008 | 21588755 | 36 |
0.009 | 5646340 | 17 |
0.010 | 3805442 | 13 |
0.011 | 1727444 | 5 |
Last trade - 10.14am 04/06/2024 (20 minute delay) ? |
|
|||||
Last
0.6¢ |
  |
Change
-0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
0.6¢ | 0.6¢ | 0.6¢ | 250000 | ||
Last updated 10.12am 04/06/2024 ? |
Featured News
POS (ASX) Chart |