I think the problem is the"here we are sitting" side of things. They've been sitting for a very long time and studies and CRs haven't changed that! Hopefully if the Twig has really exited the building they might start some DOING!
- Forums
- ASX - By Stock
- POS
- Ann: Lake Johnston Engineering Scoping Study Completed
Ann: Lake Johnston Engineering Scoping Study Completed, page-9
-
- There are more pages in this discussion • 110 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POS (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $16.81M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $7.554K | 1.916M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
119 | 96109480 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 48590224 | 51 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
119 | 96109480 | 0.003 |
35 | 64875990 | 0.002 |
17 | 35412753 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 48590224 | 51 |
0.005 | 28980868 | 20 |
0.006 | 8516341 | 10 |
0.007 | 2844708 | 8 |
0.008 | 1800000 | 1 |
Last trade - 13.40pm 08/10/2024 (20 minute delay) ? |
Featured News
POS (ASX) Chart |