With only half the pond area required
the at all cost sprint to the UNPERMITED finish line
may be in vein
2700 ton of product isn’t going to do much
maybe the extra $200 000 000 is to keep the office running
while the rest of the ponds are permitted then constructed
filled evaporated and then harvested