Originally posted by sevo:
↑
Train 1 ponds are 100 + 25 Ha, used to drain the supersaturated Williamson pit. DFS states total ponds required = 686 + 96 Ha. The supersaturated pit has yielded 27Kt salts which should produce 2.9Kt SOP (as per DFS, salts harvested 2.27Mtpa to produce 245Ktpa with the addition of 42Ktpa MOP)? They drained the pit in H2 2019? Evaporation cycle has taken over 12 months?? I’m prepared to have my maths corrected but I’m scratching my head working out how they are going to produce 245Ktpa. I could be misunderstanding something? Is the halite included in the 2.27Mtpa??
Expand
Perhaps they haven’t fully harvested train 1? A ratio of plant feed salts to SOP of around 10:1 is ball park. If the 125Ha train 1 has only produced 27000T of salts then there is something wrong. The March harvest must be from train 1. Train 1 was filled with supersaturated brine, it should have reached the point of harvesting sooner than native Lake Way brine. Gotta wonder if they are short on acreage or unlined ponds are underperforming or they overestimated recoveries in the DFS??