SVG 25.0% 3.5¢ savannah goldfields limited

10 cents per tonne per kilometre is the correct trucking rate...

  1. 547 Posts.
    lightbulb Created with Sketch. 184
    10 cents per tonne per kilometre is the correct trucking rate but it’s only charged one way not round trip so halve the trucking cost. Process plant cost is circa $100-150/tonne total cost but could be as low as $15-50 if it’s a small % of Lorenas total feed and they only charge for the extra op cost to feed it in on top. Downgrade by 90% for plant recovery for gold sold. Then a revenue share is the big number aka do Lorena get 80% or 50% of the revenue from gold sales? And to mining cost?? Anything from $30-80/tonne who knows? Corporate costs are known from quarterly cashflow releases to ASX divided into the months of the operation.
 
watchlist Created with Sketch. Add SVG (ASX) to my watchlist
(20min delay)
Last
3.5¢
Change
0.007(25.0%)
Mkt cap ! $9.838M
Open High Low Value Volume
2.9¢ 3.5¢ 2.9¢ $2.96K 89.51K

Buyers (Bids)

No. Vol. Price($)
1 150000 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 142271 4
View Market Depth
Last trade - 12.34pm 03/05/2024 (20 minute delay) ?
SVG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.