It is now all about cost-benefit analysis, and making a few dollars more.
Increased demand and competition (especially overseas brine production) requires more efficient processing of lithium. The bottom line is: Australian scientists and engineers have basically given a small pilot plant for Sileach a tick of approval.
Lithium mining companies should be running the numbers (or ruler) over a large scale Sileach pilot plant, as the engineers have itemised the nuts and bolts required to get things going on an industrial scale. It would be good if the engineers included expansion plans as an incentive.
Sileach (or LMax - LIT has 3 licences) is only an idea if you don't build it. I think some signed deals coming soon makes is as good as built by Xmas!
- Forums
- ASX - By Stock
- LIT
- Ann: Large-Scale Pilot Plant study exceeds design criteria
Ann: Large-Scale Pilot Plant study exceeds design criteria, page-61
-
- There are more pages in this discussion • 89 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LIT (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $27.32M |
Open | High | Low | Value | Volume |
2.1¢ | 2.2¢ | 2.1¢ | $34.87K | 1.656M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 1869519 | 2.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.2¢ | 772833 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 1869519 | 0.021 |
35 | 5873849 | 0.020 |
13 | 1419025 | 0.019 |
18 | 1937133 | 0.018 |
3 | 360003 | 0.017 |
Price($) | Vol. | No. |
---|---|---|
0.022 | 772833 | 6 |
0.023 | 2401083 | 14 |
0.024 | 1254183 | 8 |
0.025 | 1002344 | 8 |
0.026 | 284721 | 4 |
Last trade - 16.10pm 03/10/2024 (20 minute delay) ? |
Featured News
LIT (ASX) Chart |