Earaheedy Zn-Pb Project – Exploration Target
Range Tonnes Grade
Upper 100,000,000 4.5% Zn+Pb
Lower 40,000,000 3.5% Zn+Pb
USD 3000 * above tons * concentration % comes with upper 13.5 billion and lower 4.2 billion, without any cut-off.
Just curious about how much can it be, even minus a 50% cutoff considering the low concentration and zinc extraction cost, the figure is still amazing. There must be something wrong here for this calculation...
anyone can make it more clear? thx in advance.
- Forums
- ASX - By Stock
- Ann: Large Scale SEDEX Style System Emerging at Earaheedy Project
Earaheedy Zn-Pb Project – Exploration TargetRange Tonnes...
- There are more pages in this discussion • 101 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
-0.006(9.84%) |
Mkt cap ! $38.65M |
Open | High | Low | Value | Volume |
5.8¢ | 5.8¢ | 5.3¢ | $174.1K | 3.158M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 8041 | 5.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.8¢ | 33460 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 8041 | 0.055 |
1 | 35385 | 0.054 |
1 | 56000 | 0.053 |
1 | 19500 | 0.051 |
4 | 162500 | 0.050 |
Price($) | Vol. | No. |
---|---|---|
0.058 | 33460 | 1 |
0.060 | 14925 | 1 |
0.061 | 473653 | 2 |
0.062 | 21995 | 1 |
0.063 | 24358 | 1 |
Last trade - 15.55pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
5.5¢ |
  |
Change
-0.006 ( 8.33 %) |
|||
Open | High | Low | Volume | ||
5.7¢ | 5.8¢ | 5.2¢ | 293858 | ||
Last updated 15.55pm 03/05/2024 ? |
Featured News
RTR (ASX) Chart |