Sorry to see you out... All the best to you.
I was interested to see the results for
EHRC 051
38m @ 1.12% Zn + Pb from 38m inc 7m @ 4.05 Zn + Pb 5.3 g/t Ag from 48m.
This is the highest grade in line 1 and is right up against our 100% tenement (E69/3787) which almost certainly indicates the mineralisation extends into it.
I’m betting that this tenement will be granted well inside the 6 months estimated by Rumble and will be a further catalyst for a re rate.
AIMO.
Jim.
- Forums
- ASX - By Stock
- RTR
- Ann: Large Scale SEDEX Style System Emerging at Earaheedy Project
Ann: Large Scale SEDEX Style System Emerging at Earaheedy Project, page-68
-
-
- There are more pages in this discussion • 136 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.9¢ |
Change
-0.003(7.14%) |
Mkt cap ! $29.50M |
Open | High | Low | Value | Volume |
4.0¢ | 4.1¢ | 3.9¢ | $23.61K | 589.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 313079 | 3.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 300000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 313079 | 0.039 |
3 | 509987 | 0.038 |
1 | 270000 | 0.037 |
1 | 200000 | 0.036 |
4 | 817824 | 0.035 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 300000 | 2 |
0.041 | 319157 | 2 |
0.042 | 364246 | 2 |
0.043 | 277010 | 3 |
0.044 | 355000 | 2 |
Last trade - 16.10pm 27/08/2024 (20 minute delay) ? |
Featured News
RTR (ASX) Chart |
The Watchlist
SBW
SHEKEL BRAINWEIGH LTD
Dani Nadri, Country Manager Australia
Dani Nadri
Country Manager Australia
SPONSORED BY The Market Online