SDV 0.00% 36.0¢ scidev ltd

It won't work like that as it comes down to chemical consumption...

  1. 1,531 Posts.
    lightbulb Created with Sketch. 265
    It won't work like that as it comes down to chemical consumption rates given metallurgy & flow sheet of an operation. Just because the mine producers more tonne, doesn't mean it needs more chemicals. ILU and mineral sands often have more clays, slimes that you don't see in copper or base metal operations. I suspect ILU will be consuming a lot more chemicals per tonne than La Bambas thus doubt that a long term commercial contract for La Bambas would generate revenue on a volume scale like you suggest. It'll most likely be less than $4m.
 
watchlist Created with Sketch. Add SDV (ASX) to my watchlist
(20min delay)
Last
36.0¢
Change
0.000(0.00%)
Mkt cap ! $68.32M
Open High Low Value Volume
36.0¢ 36.0¢ 36.0¢ $26.69K 74.16K

Buyers (Bids)

No. Vol. Price($)
5 27858 35.0¢
 

Sellers (Offers)

Price($) Vol. No.
36.0¢ 23335 2
View Market Depth
Last trade - 12.27pm 26/06/2024 (20 minute delay) ?
SDV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.