The current qtr is going to be worse than the last qtr. This however should come as no surprise. This has been obvious since the last quarterly when they said they would be in low grade ore for most of the current qtr.
As to why they processed low grade ore I can only conclude that this was the optimun way to mine the resource given that the tailing's have to be deposited back into into the dam. I would assume if you bypass a section of the dam then you cant come back as they will have deposited tailings on top of the unmined ore.
- Forums
- ASX - By Stock
- Ann: Las Lagunas Gold/Silver Project Feed Grades Update
The current qtr is going to be worse than the last qtr. This...
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
KAI
Pilbara Minerals buys land off Kairos part of its York gold project for $20M – and a 2% royalty on any PLS gold sales
Add AAU (ASX) to my watchlist
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.845M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $6.892K | 1.748M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
60 | 60143294 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 30354307 | 26 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
52 | 56898424 | 0.003 |
26 | 35568145 | 0.002 |
14 | 26729950 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 30104307 | 25 |
0.005 | 5682256 | 9 |
0.006 | 1760493 | 5 |
0.007 | 2906213 | 3 |
0.008 | 4632238 | 4 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
AAU (ASX) Chart |