Ok got it.....Las Tapias
Drilling should be in full swing now and only a few months to wait until completed
Happy to read that mining licences already exist.........and this is just an extension of works .......I think I have that correct but please advise if I have the bull by the udders here
Permitting
for
the
drilling
has
commenced.
As
the
Las
Tapias
Mine
is
currently
in
operation
for
mica,
albeit
small
scale,
it
has
an
existing
Environmental
Impact
Study
and
Operating
Permit
in
place.
The
Company
is
simply
applying
for
an
extension
of
this
permit
to
include
drilling
within
the
Mining
Licences
to
allow
an
upgrade
of
operations.
It
is
expected
the
permit
will
be
achieved
in
February
‐
March
2018
to
allow
commencement
of
drilling
during
March
2018
Permitting
for
the
drilling
has
commenced.
As
the
Las
Tapias
Mine
is
currently
in
operation
for
mica,
albeit
small
scale,
it
has
an
existing
Environmental
Impact
Study
and
Operating
Permit
in
place.
The
Company
is
simply
applying
for
an
extension
of
this
permit
to
include
drilling
within
the
Mining
Licences
to
allow
an
upgrade
of
operations.
It
is
expected
the
permit
will
be
achieved
in
February
‐
March
2018
to
allow
commencement
of
drilling
during
March
2018
- Forums
- ASX - By Stock
- Ann: Las Tapias Mine - Project Update
Ok got it.....Las Tapias Drilling should be in full swing now...
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NPM (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.166M |
Open | High | Low | Value | Volume |
1.4¢ | 1.4¢ | 1.4¢ | $980 | 70K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 75000 | 1.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.5¢ | 1070000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 75000 | 0.013 |
5 | 676000 | 0.012 |
2 | 600000 | 0.011 |
2 | 308000 | 0.010 |
2 | 200000 | 0.009 |
Price($) | Vol. | No. |
---|---|---|
0.015 | 1070000 | 2 |
0.016 | 100500 | 2 |
0.017 | 183716 | 2 |
0.018 | 1446651 | 3 |
0.019 | 1803364 | 3 |
Last trade - 11.07am 05/08/2024 (20 minute delay) ? |
Featured News
NPM (ASX) Chart |