EVR 0.00% 0.5¢ ev resources ltd

Ann: Latest High-Grade Parag Project Assays Continue to Impress, page-6

  1. 1,061 Posts.
    lightbulb Created with Sketch. 241
    Next Steps
    Assays of the remaining five drill holes are in the laboratory and further results are expected in the weeks ahead. EVR’s geologists are carefully logging the core and modelling the geology, and drilling will resume in May, when the wet season has passed, and drilling and core transport will be quicker and safer.

    Relogging program for the holes drilled by Orion in 2011 will begin in the following weeks with the purpose of updating and confirming the geological model and in particular examining the contacts between breccia and intrusive mineralization.

    Hugh Callaghan said “Holes APG001 and APG002 are outstanding drilling intercepts and confirm that the copper-molybdenum mineralization is of a grade that offers tremendous economic potential in a market that needs new copper and molybdenum production. We anticipate release of the remaining 5 holes from this programme over the coming weeks”.

    My bolding. Plenty happening.
 
watchlist Created with Sketch. Add EVR (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $6.981M
Open High Low Value Volume
0.5¢ 0.5¢ 0.5¢ $531 106.1K

Buyers (Bids)

No. Vol. Price($)
21 7544978 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 1306445 1
View Market Depth
Last trade - 10.16am 05/08/2024 (20 minute delay) ?
EVR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.