PV1 0.00% 2.5¢ provaris energy ltd

Ann: Launch of Compressed Hydrogen Ship, page-215

  1. 4,092 Posts.
    lightbulb Created with Sketch. 208
    Can someone tell me, If they're building this specialised ship, they also need to build the loading and off loading facilities right? Or are they expecting those to be built by others? If it's the later, wont they need to wait until those facilities are built? From the documentation i've read, they look very specific to the ship design. I.e they'll need compatible interconnecting parts.
 
watchlist Created with Sketch. Add PV1 (ASX) to my watchlist
(20min delay)
Last
2.5¢
Change
0.000(0.00%)
Mkt cap ! $15.69M
Open High Low Value Volume
2.5¢ 2.5¢ 2.5¢ $12.14K 485.7K

Buyers (Bids)

No. Vol. Price($)
4 50378 2.5¢
 

Sellers (Offers)

Price($) Vol. No.
2.7¢ 73333 2
View Market Depth
Last trade - 10.32am 25/07/2024 (20 minute delay) ?
PV1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.