PV1 3.85% 2.5¢ provaris energy ltd

Can someone tell me, If they're building this specialised ship,...

  1. 4,092 Posts.
    lightbulb Created with Sketch. 208
    Can someone tell me, If they're building this specialised ship, they also need to build the loading and off loading facilities right? Or are they expecting those to be built by others? If it's the later, wont they need to wait until those facilities are built? From the documentation i've read, they look very specific to the ship design. I.e they'll need compatible interconnecting parts.
 
watchlist Created with Sketch. Add PV1 (ASX) to my watchlist
(20min delay)
Last
2.5¢
Change
-0.001(3.85%)
Mkt cap ! $15.69M
Open High Low Value Volume
2.6¢ 2.6¢ 2.5¢ $3.758K 144.8K

Buyers (Bids)

No. Vol. Price($)
7 528148 2.5¢
 

Sellers (Offers)

Price($) Vol. No.
2.7¢ 166000 2
View Market Depth
Last trade - 16.10pm 24/07/2024 (20 minute delay) ?
PV1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.