G, gauges are installed below the permafrost, so over a 1000ft down (from memory). The zone above is filled with diesel, as any water in there would freeze and damage the well casing.
The gauges will be retrieved on reopening the well, the well itself is engineered to withstand the pressures.
Cheers
- Forums
- ASX - By Stock
- Ann: Lease Update
G, gauges are installed below the permafrost, so over a 1000ft...
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add 88E (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $57.86M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 1452520 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 2105474 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
36 | 46812564 | 0.002 |
518 | 1325396424 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 621964323 | 218 |
0.004 | 164715938 | 106 |
0.005 | 99168867 | 48 |
0.006 | 37991234 | 35 |
0.007 | 36773442 | 20 |
Last trade - 09.47am 23/09/2024 (20 minute delay) ? |
88E (ASX) Chart |
Day chart unavailable