Lots of golf to be played before there is any chance of this being commercial. They still need to do a resource-reserve conversion, moving resources into the ‘measured’ category and reserves into either ‘probable’ or ‘proven’. They are at step one-and-a-half of the 5-step JORC ladder.
In order to get there, they need to do substantial infill drilling, which may not necessarily increase the size of the MRE (1.45MT), but merely move tonnages beween said JORC categories.
Such a drilling campaign will be expensive, and not justifiable for such a small resource.
Next steps should be to extend the MRE (find more tonnes), before doing any resource-reserve conversion, before we can talk about any economics.
- Forums
- ASX - By Stock
- Ann: Legend Delivers Maiden Mineral Resource Estimate for Mawson
Lots of golf to be played before there is any chance of this...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LEG (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $37.82M |
Open | High | Low | Value | Volume |
1.3¢ | 1.3¢ | 1.3¢ | $0 | 5 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 115177 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 1326867 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 115177 | 0.012 |
6 | 1832583 | 0.011 |
8 | 1534937 | 0.010 |
5 | 2101211 | 0.009 |
2 | 1370000 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 1326867 | 2 |
0.014 | 28766 | 3 |
0.015 | 441000 | 3 |
0.016 | 158075 | 3 |
0.017 | 800000 | 1 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
LEG (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online