This is a small setback as there will be 6 months added to time frame. Company has not indicated if there are any material cost impacts but I assume reworking the site-specific integration details such as footings, plant interface, control system interfacing will take some time and cost.
I would hope the Company can give some further detail once the new site is selected.
- Forums
- ASX - By Stock
- CXL
- Ann: Leilac-2 to relocate as HM end clinker production at Hanover
Ann: Leilac-2 to relocate as HM end clinker production at Hanover, page-2
-
-
- There are more pages in this discussion • 59 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXL (ASX) to my watchlist
|
|||||
Last
91.0¢ |
Change
-0.015(1.62%) |
Mkt cap ! $167.9M |
Open | High | Low | Value | Volume |
92.5¢ | 93.0¢ | 90.0¢ | $193.5K | 211.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 7624 | 90.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
91.5¢ | 10125 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 9758 | 0.905 |
23 | 174686 | 0.900 |
5 | 22226 | 0.895 |
8 | 62369 | 0.890 |
3 | 86159 | 0.885 |
Price($) | Vol. | No. |
---|---|---|
0.910 | 2774 | 13 |
0.915 | 18088 | 11 |
0.920 | 9090 | 4 |
0.925 | 2100 | 1 |
0.930 | 16478 | 1 |
Last trade - 13.03pm 25/07/2024 (20 minute delay) ? |
Featured News
CXL (ASX) Chart |