This is a small setback as there will be 6 months added to time frame. Company has not indicated if there are any material cost impacts but I assume reworking the site-specific integration details such as footings, plant interface, control system interfacing will take some time and cost.
I would hope the Company can give some further detail once the new site is selected.
- Forums
- ASX - By Stock
- Ann: Leilac-2 to relocate as HM end clinker production at Hanover
This is a small setback as there will be 6 months added to time...
-
-
- There are more pages in this discussion • 59 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.15 |
Change
-0.005(0.43%) |
Mkt cap ! $213.1M |
Open | High | Low | Value | Volume |
$1.17 | $1.19 | $1.14 | $69.68K | 59.80K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 942 | $1.15 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.15 | 1956 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 927 | 1.145 |
10 | 4853 | 1.140 |
8 | 8228 | 1.135 |
3 | 16226 | 1.130 |
2 | 2151 | 1.125 |
Price($) | Vol. | No. |
---|---|---|
1.150 | 1840 | 5 |
1.155 | 2129 | 6 |
1.160 | 933 | 2 |
1.165 | 19599 | 7 |
1.170 | 460 | 1 |
Last trade - 12.50pm 27/09/2024 (20 minute delay) ? |
Featured News
CXL (ASX) Chart |