This is a small setback as there will be 6 months added to time frame. Company has not indicated if there are any material cost impacts but I assume reworking the site-specific integration details such as footings, plant interface, control system interfacing will take some time and cost.
I would hope the Company can give some further detail once the new site is selected.
- Forums
- ASX - By Stock
- Ann: Leilac-2 to relocate as HM end clinker production at Hanover
This is a small setback as there will be 6 months added to time...
-
-
- There are more pages in this discussion • 59 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Gold nuggets unearthed at Comet Well ahead of drilling! Discoveries continue as exploration ramps up
LU7
The Breakdown: Lithium Universe talks refinery design and lithium processing in strong preliminary feasibility study for Bécancour
Add CXL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.11 |
Change
-0.040(3.48%) |
Mkt cap ! $202.1M |
Open | High | Low | Value | Volume |
$1.16 | $1.17 | $1.10 | $265.7K | 236.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 3588 | $1.11 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.12 | 8000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 3588 | 1.110 |
7 | 79855 | 1.100 |
1 | 2085 | 1.095 |
1 | 2085 | 1.090 |
2 | 27085 | 1.085 |
Price($) | Vol. | No. |
---|---|---|
1.115 | 8000 | 1 |
1.120 | 2085 | 1 |
1.125 | 2085 | 1 |
1.130 | 2085 | 1 |
1.150 | 5584 | 2 |
Last trade - 16.10pm 09/10/2024 (20 minute delay) ? |
Featured News
CXL (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
SPONSORED BY The Market Online