Yippy, finally an official update from the best source ... and its as good as is expected given our circumstances. @siberiancactus 's summary is a pretty good one ... with one correction ... "- As of EO2024,(should be 2023) we have committed US$241 of the US$285 construction total (~85%)."
Roll on LLL Management solving, and ticking off, those "unknowns"!
- Forums
- ASX - By Stock
- Ann: Leo Lithium Provides Project Update
Yippy, finally an official update from the best source ... and...
- There are more pages in this discussion • 113 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $498.5M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online