1Mtpa spodumene concentrates, that's 4.6Mtpa ore processing, for 20 years mining life, you only need 92Mt resource. I expect the upcoming resource update to be 180Mt plus. So that's plenty of room for stage 3 expansion. Ganfeng existing annual production capacity is around 120Ktpa LCE, they aiming to reach 300Ktpa LCE by 2025, further to 600Ktpa LCE by 2030. That requires massive lithium materials, so Goulamina project is very important for Ganfeng, imo.
- Forums
- ASX - By Stock
- LLL
- Ann: Leo Lithium Secures A$106m Strategic Placement with Ganfeng
Ann: Leo Lithium Secures A$106m Strategic Placement with Ganfeng, page-99
-
- There are more pages in this discussion • 83 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $605.4M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
LLL (ASX) Chart |
Day chart unavailable