Yes @DaisyA
This is an incredibly good announcement for me. LTR will not pay anythting and Zenith Energy will finance, design, construct, own, operate and maintain a 95MW hybrid power station at Kathleen Valley.
Normally the energy problem is a huge burden on the shoulders of min developers. The expense for building the infrastructure and bringing the power to the plant is expensive and hard job. LTR is not going to do anything at that front. That is fantastic.
From the ESG perspective it also ticks the box.
Very good.
Now we need to see who is holding LTR's sp back in these days when the all producers have made ATH records (Albemarle, Livent, PLS, AKE have all done that)! The trades in LTR is very suspicious. It's clear that someone holds back LTR.Is it the shorters?Or is it a big company (a miner or an auto OEM) which want to build a big stake in LTR? Or is it a combination of those two things?
Patiently waiting.
We will see it soon.
- Forums
- ASX - By Stock
- LTR
- Ann: Letter of Award for Kathleen Valley Hybrid Power Station
Ann: Letter of Award for Kathleen Valley Hybrid Power Station, page-31
-
-
- There are more pages in this discussion • 38 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
96.5¢ |
Change
0.050(5.46%) |
Mkt cap ! $2.340B |
Open | High | Low | Value | Volume |
92.0¢ | 98.0¢ | 92.0¢ | $15.00M | 15.73M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 148095 | 96.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
96.5¢ | 275693 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 147995 | 0.960 |
4 | 131047 | 0.955 |
9 | 273581 | 0.950 |
7 | 187600 | 0.945 |
5 | 320540 | 0.940 |
Price($) | Vol. | No. |
---|---|---|
0.970 | 30015 | 3 |
0.975 | 7362 | 2 |
0.980 | 103380 | 5 |
0.985 | 35000 | 4 |
0.990 | 233050 | 10 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
LTR (ASX) Chart |