LTR 5.46% 96.5¢ liontown resources limited

Ann: Letter of Award for Kathleen Valley Hybrid Power Station, page-31

  1. 5,946 Posts.
    lightbulb Created with Sketch. 20345
    Yes @DaisyA
    This is an incredibly good announcement for me. LTR will not pay anythting and Zenith Energy will finance, design, construct, own, operate and maintain a 95MW hybrid power station at Kathleen Valley.

    Normally the energy problem is a huge burden on the shoulders of min developers. The expense for building the infrastructure and bringing the power to the plant is expensive and hard job. LTR is not going to do anything at that front. That is fantastic.

    From the ESG perspective it also ticks the box.

    Very good.

    Now we need to see who is holding LTR's sp back in these days when the all producers have made ATH records (Albemarle, Livent, PLS, AKE have all done that)! The trades in LTR is very suspicious. It's clear that someone holds back LTR.Is it the shorters?Or is it a big company (a miner or an auto OEM) which want to build a big stake in LTR? Or is it a combination of those two things?

    Patiently waiting.
    We will see it soon.
 
watchlist Created with Sketch. Add LTR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.