Yes if only the government would build this much gas and diesel ‘redundancy’ into their heavily subsidised goose green energy policies, then we might have a stable grid going forward.
And a big battery, that’s also what we need, only need to completely replace that after 10 years.
- Forums
- ASX - By Stock
- LTR
- Ann: Letter of Award for Kathleen Valley Hybrid Power Station
Ann: Letter of Award for Kathleen Valley Hybrid Power Station, page-41
-
-
- There are more pages in this discussion • 28 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
74.0¢ |
Change
-0.030(3.90%) |
Mkt cap ! $1.794B |
Open | High | Low | Value | Volume |
77.0¢ | 77.0¢ | 73.5¢ | $12.03M | 16.10M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 339920 | 74.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
74.5¢ | 109036 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 339920 | 0.740 |
8 | 870031 | 0.735 |
20 | 102940 | 0.730 |
14 | 242553 | 0.725 |
20 | 180133 | 0.720 |
Price($) | Vol. | No. |
---|---|---|
0.745 | 21500 | 2 |
0.750 | 131650 | 4 |
0.755 | 257600 | 3 |
0.760 | 149266 | 7 |
0.765 | 29342 | 3 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
LTR (ASX) Chart |