Possibly right, not sure how much overburden would need to be removed, with stage 1 of mining, from what I remember of the presentation, ore is processed from the surface down given that copper and gold shows quite shallow for the Hillside deposit.
Majority of dirt would probably go through the Mill quite early after first excavations. But I could be wrong
- Forums
- ASX - By Stock
- Ann: Letter of Intent with Hitachi executed for Mining Fleet
Possibly right, not sure how much overburden would need to be...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RXM (ASX) to my watchlist
(20min delay)
|
|||||
Last
46.5¢ |
Change
0.005(1.09%) |
Mkt cap ! $364.2M |
Open | High | Low | Value | Volume |
46.0¢ | 46.5¢ | 46.0¢ | $153.4K | 332.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 7273055 | 46.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
46.5¢ | 8682134 | 57 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 7273055 | 0.460 |
13 | 6221744 | 0.455 |
4 | 1031153 | 0.450 |
2 | 43211 | 0.445 |
3 | 87749 | 0.440 |
Price($) | Vol. | No. |
---|---|---|
0.465 | 8682134 | 57 |
0.470 | 4234958 | 29 |
0.475 | 1117260 | 5 |
0.480 | 63316 | 5 |
0.500 | 45631 | 5 |
Last trade - 16.10pm 18/09/2024 (20 minute delay) ? |
Featured News
RXM (ASX) Chart |