The SAG mill is also a long lead time item. Specifically the ring gear taking a long time to manufacture (cast) with suitable precision.
I guess it's a little less than the ultra-mining equipment and one doesn't need a support team on site. Like the ultra-mining equipment, a brand new mill could be sold to a third party when they become critical path pieces of equipment even at a small profit as happed in the last boom.
Still, I look forward to further signs that RXM is ready to hit the go button.
All IMVHO.
- Forums
- ASX - By Stock
- Ann: Letter of Intent with Hitachi executed for Mining Fleet
The SAG mill is also a long lead time item. Specifically the...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RXM (ASX) to my watchlist
|
|||||
Last
44.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $344.6M |
Open | High | Low | Value | Volume |
45.0¢ | 45.0¢ | 44.5¢ | $342.6K | 767.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
20 | 4382122 | 44.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
45.0¢ | 2683981 | 53 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
20 | 4382122 | 0.445 |
41 | 10580089 | 0.440 |
30 | 2153418 | 0.435 |
17 | 651344 | 0.430 |
9 | 454696 | 0.425 |
Price($) | Vol. | No. |
---|---|---|
0.450 | 2683240 | 52 |
0.455 | 753445 | 15 |
0.460 | 517019 | 13 |
0.465 | 1843889 | 12 |
0.470 | 1209039 | 22 |
Last trade - 14.43pm 30/07/2024 (20 minute delay) ? |
Featured News
RXM (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online