It's good to see they are getting their long lead item build slots locked in and it's obvious the OEM are there to support this project if they are doing it without requiring an upfront deposit. Well played by the Management, that would have taken some negotiation. Most OEM's want 15% deposit upfront in this type of market to hold onto a slot.
Ann: Letter of Intent with Hitachi executed for Mining Fleet, page-3
Add to My Watchlist
What is My Watchlist?