@the squash @prawn_man
I have a question for the mining specialists among us.
If we accept the assumptions discussed above, and we accept that the economics work.
What is the best case scenario to production, with a $100 million capex and a relatively simple process of so called off the shelf technology.
1 Understanding that this mining process is far simpler and less costly than say a nickel laterite resource, would there be need to drill the orebody to the extent we are at KNP (Fully scoped in advance of a decision).
2 Or is this more of a start early and drill in advance of the mining operation type scenario, accepting that the orebody exists. Obviously some drilling and detail is required to commit capex.
3 Would the PFS, DFS and BFS timeframes be lengthy like that of our KNP resource.
4 How long would it take before the diggers arrive to mine from day one of a decision to build and mine the resource.
There are a few questions there, thanks for sharing the knowledge.
RED
- Forums
- ASX - By Stock
- ARL
- Ann: Lewis Ponds met testwork produces high grade concentrates
Ann: Lewis Ponds met testwork produces high grade concentrates, page-25
-
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ARL (ASX) to my watchlist
|
|||||
Last
46.0¢ |
Change
-0.005(1.08%) |
Mkt cap ! $91.85M |
Open | High | Low | Value | Volume |
45.5¢ | 46.5¢ | 45.5¢ | $23.69K | 52.04K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 9327 | 45.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
46.5¢ | 4546 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 9327 | 0.455 |
1 | 1150 | 0.450 |
1 | 20000 | 0.435 |
2 | 12000 | 0.420 |
1 | 25000 | 0.405 |
Price($) | Vol. | No. |
---|---|---|
0.490 | 4680 | 1 |
0.500 | 11258 | 1 |
0.510 | 2192 | 1 |
0.520 | 10575 | 2 |
0.530 | 50950 | 1 |
Last trade - 15.40pm 26/07/2024 (20 minute delay) ? |
Featured News
ARL (ASX) Chart |