OEL 7.69% 1.2¢ otto energy limited

So the drills main target is 400ft below the latest update...

  1. 9,283 Posts.
    lightbulb Created with Sketch. 756
    So the drills main target is 400ft below the latest update (12023 ft vs current depth of 11580ft) you would imagine this will have to enter into a trading halt on Monday until the outcome of the drill is known, it’s clear they are targeting more than the one target sand hence the well being drilled through to 15,500 ft
 
watchlist Created with Sketch. Add OEL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.