Nice post.
Bit light on with the Capex as you need to include plant engineering, pit design, tailings and EPA, preoccument management consulting contractors, mine site and all regulatory approvals...but the Capex can be contained with existing used moduline refineries available and still achieve your numbers.
Some installations achieved a 50% savings when compared to new installs. These type of plants are designed to increase capacity as the project develops by additions to the flow sheet via takeoff points.
Lots of water under the bridge need before we're at DTM stage.
GL @jdpc35 thx for sharing.
- Forums
- ASX - By Stock
- Ann: Limon large mineralised system, multiple high-grade clusters
Nice post. Bit light on with the Capex as you need to include...
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STM (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
-0.002(14.3%) |
Mkt cap ! $42.00M |
Open | High | Low | Value | Volume |
1.2¢ | 1.2¢ | 1.1¢ | $75.26K | 6.387M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
20 | 7239023 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 4282403 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 6899023 | 0.011 |
14 | 4895800 | 0.010 |
10 | 5610176 | 0.009 |
10 | 5773824 | 0.008 |
5 | 2242999 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 2732403 | 3 |
0.013 | 1386150 | 2 |
0.014 | 1105691 | 5 |
0.015 | 3035946 | 5 |
0.016 | 3268438 | 4 |
Last trade - 16.10pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
1.2¢ |
  |
Change
-0.002 ( 11.1 %) |
|||
Open | High | Low | Volume | ||
1.1¢ | 1.2¢ | 1.1¢ | 2644449 | ||
Last updated 15.59pm 03/05/2024 ? |
Featured News
STM (ASX) Chart |