WKT 0.00% 12.5¢ walkabout resources ltd

And building a tailings dam usually means taking out ore, lining...

  1. 917 Posts.
    lightbulb Created with Sketch. 164
    And building a tailings dam usually means taking out ore, lining said dam and stockpiling ore removed which hasn't been used for retaining. Of course you need ore to process to remove the graphite, leaving over residue to put into tailings dam. Who are you to say that some of the identified ore won't be stockpiled for processing and waste used for the tailings dam build? Haul roads are built out of ore to be processed as the road is reclaimed. I'm sure they will have someone who knows about the recovery of graphite under in or near infrastructure, considering there will be earthworks to build said infrastructure. Why are you on here non holder?
    Last edited by swarby: 21/06/21
 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
12.5¢
Change
0.000(0.00%)
Mkt cap ! $83.90M
Open High Low Value Volume
12.5¢ 12.5¢ 12.5¢ $20.01K 160.0K

Buyers (Bids)

No. Vol. Price($)
1 1177 12.5¢
 

Sellers (Offers)

Price($) Vol. No.
13.0¢ 559778 15
View Market Depth
Last trade - 12.25pm 29/05/2024 (20 minute delay) ?
Last
12.5¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
12.5¢ 12.5¢ 12.5¢ 8521
Last updated 13.51pm 29/05/2024 ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.