Stockrocker Quote Remember MNS has only 3 times the resource size with much lower grade but a mc that is 30 times.
Walkabout Strategy is to locate high grade ore at or near surface resulting in lower capex and operational cost's.Walkabout Resources have modeled a modular plant that will be built in a modern factory then shipped in containers bolted together onsite. This will simplify the the development and construction logistics reducing time to delivery of concentrate.
High priority target have already been identified for rapid expansion.The key is to get the first stage up and running leap frogging others to production and mitigating risk with right size concepts.
Croc
- Forums
- ASX - By Stock
- WKT
- Ann: Lindi Jumbo Definitive Feasibility Study
Ann: Lindi Jumbo Definitive Feasibility Study, page-94
-
- There are more pages in this discussion • 337 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.2¢ |
Change
-0.004(4.17%) |
Mkt cap ! $61.75M |
Open | High | Low | Value | Volume |
9.7¢ | 9.7¢ | 8.9¢ | $45.75K | 501.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 200000 | 9.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.5¢ | 5315 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 200000 | 0.093 |
1 | 5500 | 0.092 |
1 | 10000 | 0.090 |
2 | 81246 | 0.089 |
2 | 58000 | 0.088 |
Price($) | Vol. | No. |
---|---|---|
0.095 | 5315 | 1 |
0.096 | 59293 | 2 |
0.098 | 61183 | 1 |
0.105 | 343296 | 3 |
0.110 | 169999 | 3 |
Last trade - 12.53pm 01/11/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |