That 13-14% TGC was development ore stock piled during construction Spid , better than throwing it away ah , all the 17.9 TGC plus is to come , At full production, Lindi Jumbo will be the highest margin producing graphite mine globally,shame you read with one eye only. how about the 87% recovery during commissioning , you missed that too , was that you that said recovery would be 23% ? great day for WKT investors bad day getting worse for those holding nothing but what's in their pants.
To date, plant feed has been from the development ore stockpile that was created during the construction phase and the head feed grade is steady between 13 - 14% TGC which correlates perfectly with the geological block model of the mineralisation mined during this period.
- Forums
- ASX - By Stock
- WKT
- Ann: Lindi Jumbo gears up for first graphite concentrate export
Ann: Lindi Jumbo gears up for first graphite concentrate export, page-33
-
-
- There are more pages in this discussion • 742 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $63.76M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
WKT (ASX) Chart |
Day chart unavailable
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, MD & CEO
Charles Armstrong
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online