It just shows how naive these guys are. Spid was first trying to tell us the plant wasn’t going to be able to run for 48hrs when it first come online and wanted an argument that holders would say yes it will. We have always said it was a staged ramp up. He was the only one expecting it would run 48hrs in the early stages so he could then say see it doesn’t work.
He expected to hit the green button and everything would work perfectly and if it didn’t he can then say see it is a failure.
I was just having a conversation the other day about the site I work on that is 10 years old and with a new Fixed Plant Manager has shown how we can reduce maintenance and breakdowns, and improve production by a few simple principles when feeding the plant. There will always be improvements and even if there was a plan at the beginning to run the plant for 48hrs then focus on the other things these things can change and other factors while ramping up can change the plan. Ultimately the end result should take the same time and Jinpeng have covered a lot of extra costs which comes under their contract to provide the quality as well as throughput
- Forums
- ASX - By Stock
- WKT
- Ann: Lindi Jumbo gears up for first graphite concentrate export
Ann: Lindi Jumbo gears up for first graphite concentrate export, page-697
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.9¢ |
Change
0.002(2.06%) |
Mkt cap ! $66.45M |
Open | High | Low | Value | Volume |
9.8¢ | 10.0¢ | 9.8¢ | $56.03K | 561.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 12963 | 9.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 99813 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 12963 | 0.099 |
4 | 157174 | 0.098 |
3 | 385876 | 0.096 |
4 | 73528 | 0.095 |
1 | 1 | 0.094 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 99813 | 1 |
0.110 | 10165 | 2 |
0.115 | 120000 | 2 |
0.120 | 299902 | 6 |
0.125 | 395466 | 7 |
Last trade - 16.10pm 27/08/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |
The Watchlist
SBW
SHEKEL BRAINWEIGH LTD
Dani Nadri, Country Manager Australia
Dani Nadri
Country Manager Australia
SPONSORED BY The Market Online