Yes egg in face moment for sure Stirer
The plant can run continuously for 48 hours, it just needs to be dialed back to achieve this result
In june Mike was claiming 30 tph were being achieved, Sirrobbo had mentioned 52 tph had been reached, yet these volumes have been slashed down to under 21T per hour to see the plant achieve 48 hours of continuous operation.
even at this throughput it isnt high enough for the EPC contractor to be paid and WKT can take over ownership.
Lets or ramp the success of a plant operating at idle to achieve 48 hours of continuous operation.
- Forums
- ASX - By Stock
- Ann: Lindi Jumbo gears up for first graphite concentrate export
Yes egg in face moment for sure StirerThe plant can run...
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.5¢ |
Change
0.006(6.06%) |
Mkt cap ! $67.12M |
Open | High | Low | Value | Volume |
10.0¢ | 10.5¢ | 10.0¢ | $2.921K | 27.97K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 179619 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 175158 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 144496 | 0.100 |
3 | 71963 | 0.099 |
3 | 132174 | 0.098 |
1 | 6701 | 0.097 |
3 | 385876 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 175158 | 2 |
0.110 | 53165 | 4 |
0.115 | 120000 | 2 |
0.120 | 299902 | 6 |
0.125 | 395466 | 7 |
Last trade - 15.45pm 28/08/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |
The Watchlist
UNT
UNITH LTD
Idan Schmorak, CEO
Idan Schmorak
CEO
Previous Video
Next Video
SPONSORED BY The Market Online