Clearly Spid81 wants to avoid discussion of the ADU presentation...Tip ranks has him at the bottom of blogger ratings for advice...
MRC was a disaster and EGR have little hope of being developed...But he loves them
Hi spid81 I suggest you listen to the ADU presentation…The project is achieving for month of August 55 bags a day on average from 400 ton throughput but actually achieved 84% of DFS stage 1 capacity…At 400 ton throughput they fell short of 100% DFS capacity by 16 bags from double shifts…What head grade did they feed through the plant to achieve such impressive results…The reduced tonnage or draw from the ROM pad has significantly decreased through August…My estimate is around 11,000 ton processed and yet they actually achieved spectacular performance levels…Once the simple alterations are made to the drying process throughput can significantly increase if required…They have already confirmed the front end of plant operates successfully greater than DFS capacity…45t throughput per hour at DFS levels and tested at 51t/ph
Regards Croc
- Forums
- ASX - By Stock
- WKT
- Ann: Lindi Jumbo produces 94 bags of graphite in single day
Ann: Lindi Jumbo produces 94 bags of graphite in single day, page-167
-
- There are more pages in this discussion • 205 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.0¢ |
Change
0.002(2.04%) |
Mkt cap ! $70.48M |
Open | High | Low | Value | Volume |
10.5¢ | 10.5¢ | 10.0¢ | $9.319K | 90.19K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 250 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 259282 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 250 | 0.100 |
1 | 10000 | 0.099 |
2 | 46525 | 0.098 |
3 | 384633 | 0.097 |
2 | 63820 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 259282 | 5 |
0.110 | 1331213 | 8 |
0.115 | 353198 | 6 |
0.120 | 477177 | 4 |
0.125 | 219579 | 4 |
Last trade - 11.11am 11/10/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |
The Watchlist
EL8
ELEVATE URANIUM LTD
Murray Hill, MD & CEO
Murray Hill
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online