Clearly Spid81 wants to avoid discussion of the ADU presentation...Tip ranks has him at the bottom of blogger ratings for advice...
MRC was a disaster and EGR have little hope of being developed...But he loves them
Hi spid81 I suggest you listen to the ADU presentation…The project is achieving for month of August 55 bags a day on average from 400 ton throughput but actually achieved 84% of DFS stage 1 capacity…At 400 ton throughput they fell short of 100% DFS capacity by 16 bags from double shifts…What head grade did they feed through the plant to achieve such impressive results…The reduced tonnage or draw from the ROM pad has significantly decreased through August…My estimate is around 11,000 ton processed and yet they actually achieved spectacular performance levels…Once the simple alterations are made to the drying process throughput can significantly increase if required…They have already confirmed the front end of plant operates successfully greater than DFS capacity…45t throughput per hour at DFS levels and tested at 51t/ph
Regards Croc
WKT Price at posting:
9.6¢ Sentiment: Buy Disclosure: Held