***While the EPC contract has been activated, the Company is working with Jinpeng on a number of minor contractual details such as mandatory Tanzanian insurances and shipping. Once settled a final EPC contract will be finalised. An initiation payment of US $1.6 million on the EPC contract will protect the project schedule and enable work in China to get underway. The signed EPC contract is a condition precedent of the Lindi Jumbo project loan drawdown.***
I thought I should break it down further for you One Bank cazz!!! Do try to keep on top of your interpretation of WKT’S Announcements. Project on time and on schedule!!! Oh sorry; without any power outages. LOL. DYOR.
- Forums
- ASX - By Stock
- WKT
- Ann: Lindi Jumbo Project Update
Ann: Lindi Jumbo Project Update, page-247
-
- There are more pages in this discussion • 97 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $63.76M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
WKT (ASX) Chart |
Day chart unavailable
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online