Love your positive thinking Rocky!
However what we need is a slow and steady climb up rather than something as rapid as hitting 50c from the drill results.
A big rerate will encourage BCMG to request a larger amount of shares that will still be based off VWAP probably still in the 20s.
I'm more hopeful that as concrete gets laid, and containers continue to arrive, that the SP climbs up to the 50c mark by the end of Q1 without a significant rerate from black craig drill results.
- Forums
- ASX - By Stock
- Ann: Lindi Jumbo Project Update
Love your positive thinking Rocky!However what we need is a slow...
-
- There are more pages in this discussion • 328 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $73.83M |
Open | High | Low | Value | Volume |
11.0¢ | 11.5¢ | 11.0¢ | $4.298K | 38.64K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 203451 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 230858 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 188451 | 0.110 |
5 | 632988 | 0.105 |
15 | 803519 | 0.100 |
1 | 20000 | 0.099 |
4 | 316500 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 47058 | 2 |
0.120 | 437997 | 10 |
0.125 | 688059 | 12 |
0.130 | 154444 | 5 |
0.135 | 408027 | 5 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online