Hi AceGT, a great time to be invested...Development period now well advanced as construction of the plant from foundations already started...Engineers were already on-site weeks ago for sign-off on foundations...
The fourth shipment would have already left for Lindi...Another area we were advised was in termile...They were wrong again as the project approaches the plant construction
The market caps that @trousergecko is one of interest...Which month will the gap close '
Current market cap WKT $118 million EGR $256 million with no development in site
The letter of commitment for Drawdown is only days away IMO...A fully funded pathway completed with current Graphite pricing obtaining a premium to the robust DFS...US$1200 free cash margins per product ton...No downstream processing was required masking the problem with the mining projects economics...
You deserve to be involved in a World Class project...
Regards Croc (Congratulation long term holders for staying the course...)
- Forums
- ASX - By Stock
- Ann: Lindi Jumbo Project Update
Hi AceGT, a great time to be invested...Development period now...
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $63.76M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
WKT (ASX) Chart |
Day chart unavailable
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Michael Thurn, CEO & MD
Michael Thurn
CEO & MD
SPONSORED BY The Market Online