The WKT/Lindi resource is clearly aligned to Large Flake production. With 75% of Graphite Production above 180 micron.
Lindi's ROM entails a planned strip ratio of 4:1 with 1t to be processed and 3t stockpile. Lindi's stockpile in expected to be 6% TGC. Lindi's Plant capacity is over 1000t/d leaving a 3000t/d stockpiled over 300 days.
900,000t x 6%TGC = Potentially 54,000 Battery Grade Material @ $750 = $40.5M. Did I mention it was stockpile and a Free Dig.
Starting the bidding @ $20M/Year on a five year contract, do I have any opening bids. LOL. As always, DYOR.
- Forums
- ASX - By Stock
- Ann: Lindi Jumbo Project Update
The WKT/Lindi resource is clearly aligned to Large Flake...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.5¢ |
Change
0.005(5.00%) |
Mkt cap ! $70.48M |
Open | High | Low | Value | Volume |
11.0¢ | 11.0¢ | 10.0¢ | $65.81K | 626.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 306015 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 125500 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 125499 | 0.110 |
1 | 100000 | 0.105 |
6 | 191115 | 0.100 |
1 | 50000 | 0.099 |
2 | 116330 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 125500 | 2 |
0.110 | 370000 | 5 |
0.115 | 361980 | 7 |
0.120 | 477177 | 4 |
0.125 | 249179 | 4 |
Last trade - 16.10pm 01/10/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |
The Watchlist
BM8
BATTERY AGE MINERALS LTD
Nigel Broomham, CEO
Nigel Broomham
CEO
Previous Video
Next Video
SPONSORED BY The Market Online