The base of the TSF needs to be completed, Tick, The height of walls, can be raised when required, as long as the base height is complete will be sufficient the mine can start. A pity so much high-grade graphite keeps being located from the surface...
Abridging loan logically is only a smaller amount to keep the project moving, not the full amount...The project has not stopped on-site, while the ships are critical pathway if delayed...Nothing in it for you...
A great update yesterday...
Regards Croc
- Forums
- ASX - By Stock
- WKT
- Ann: Lindi Jumbo Project Update
Ann: Lindi Jumbo Project Update, page-20
-
- There are more pages in this discussion • 482 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
|
|||||
Last
9.8¢ |
Change
-0.007(6.67%) |
Mkt cap ! $65.78M |
Open | High | Low | Value | Volume |
10.0¢ | 10.5¢ | 9.1¢ | $244.2K | 2.461M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 360000 | 9.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.8¢ | 200933 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 360000 | 0.096 |
1 | 5446 | 0.095 |
1 | 33946 | 0.092 |
1 | 50000 | 0.091 |
6 | 326740 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.098 | 200933 | 1 |
0.105 | 100000 | 1 |
0.110 | 108730 | 3 |
0.115 | 180000 | 3 |
0.120 | 280360 | 7 |
Last trade - 16.10pm 06/08/2024 (20 minute delay) ? |
Featured News
NEWS
Is oil undervalued?
BOE
Uranium prices on the NYMEX are stable, but ASX uranium stocks are sinking on Friday. The answer lies in Kazakhstan
NEWS
Week 31 Wrap: JORC rules to get tougher; RBA rate hike chance 50/50; US Fed Sept cut still the quo
WKT (ASX) Chart |